Portfolio Category: Building Envelope Commissioning

Vacation Resort – Mexico

Vacation Resort Location: Mexico Dates: 2012-2014 Building Size: Three Story Construction Type: Existing Building Substrate Material: Brick and Stone Cladding Details of this project are confidential in nature. ...

Verandas Condos – Pensacola,FL

Verandas Condominiums

Location: Pensacola Beach, Florida Date: 2003-2005 Building Size: 17 story Construction Type: New Construction Substrate Material: CMU construction with direct applied EIFS Cause of Damage: Hurricane Ivan Client: Allen Levin Developer Primary Service Provided: Building Envelope Consultant Services Provided:
  • ASTM testing and analysis
  • Hurricane damage evaluation and building inspection for insurance company
  • Managed plan review
  • Mold sampling and laboratory analysis
  • Onsite inspections
  • Quality control and final sign off
  • Project manager for Hurricane Ivan recovery
...

Beach Club Condos – Pensacola, FL

Beach Club Condos

Location: Pensacola Beach, Florida Dates: 2004 – 2007 Building Size: 14 stories Substrate Materials: Concrete cladded with EIFS/ direct applied stucco system Construction Type: New Construction Client: Allen Levin Primary Service Provided: Project management and consultant of building envelope Services Provided:
  • ASTM testing
  • Building envelope blue print review,
  • Onsite inspections of building components,
  • Quality control and final sign off
  • Water testing and analysis
...

Portofino Towers – Pensacola, FL

Portofino Condominium Towers

Location: Pensacola Beach, Florida Dates: 1997-2006 Building Size: 5 towers each 21 story Construction Type: New Construction Substrate Material: CMU substrate and EIFS Cause of Damage: Hurricane Ivan during construction Managed Cost of Repairs: approximately $27 million Client: Condominium Owners Association Teamed with: Bennett Shuman AIA Primary Service Provided: Project management and consultant of building envelope Services Provided:
  • ASTM testing
  • Construction material analysis
  • Construction plan review
  • Conducted mold sampling and laboratory analysis
  • Designed scope of repair
  • Designed scope of repair for mold remediation
  • Final sign off of the quality control, waterproofing and building envelope components
  • Forensic investigation
  • Environmental testing and analysis investigation
  • Water testing and analysis
  • Weekly inspections
...