Portfolio Category: Construction Management

The Hilton Hotel – Mobile, AL

The Hilton Hotel and Plaza Center

Location: Mobile, Alabama Date: 1997-1998 Building Size: 7 Story Construction Type: Existing Construction Substrate Material: Curtain wall Cause of Damage: Lifecycle Client: Owners Primary Service Provided: Forensic investigation for water intrusion Services Provided:
  • Building envelope roofing and cladding systems analysis
  • Construction failure and defect assessment
  • Designed scope of work for all repairs and restoration
  • Forensic investigation
  • Project management of all repairs and restoration
  • Water intrusion investigation and analysis
...

Breakers Condos- Fort Walton, FL

Breakers Condominiums

Location: Fort Walton Beach, Florida Date: 1992-2004 Building Size: 2 buildings each 7 stories Construction Type: Existing Construction Substrate Material: Cladded with conventional stucco and concrete construction Cause of Damage: Lifecycle Client: Condominium Board of Directors Primary Services: Project management for reconstruction of multiple times over 12 years Services Provided:
  • Analysis of building envelope
  • Investigations of building envelope components
  • Managed bid specifications of blue prints
  • Managed bid specifications for construction
  • Moisture analysis
  • Project Management and oversight of all repairs
  • Quality control and sign off on restoration projects
  • Hurricane discovery and investigation
...

Royal Palm – Ft. Lauderdale, FL

Royal Palm Commercial Office Building

Location: Ft. Lauderdale, Florida Dates: 1997-2006 Building Size: 12 stories Construction Type: New Construction Substrate Materials: EIFS construction and concrete Client: Building Manager and Centex Rooney Primary Service Provided: Construction Project Management for Building Envelope Consultant Services Provided:
  • ASTM testing
  • Blue print review and oversight of other construction related projects to this building
  • Final inspection and sign off of the projects
  • Forensic analysis
  • Oversight of the construction
  • Plan reviews onsite inspections
  • Third party consulting
  • Water testing
...

Beach Colony – Perdido Key, FL

Beach Colony Resort Condominiums

Location: Perdido Key, Florida Dates: 2005-2007 Building Size: 18 & 20 story towers Substrate Materials: Cladded with conventional stucco and EIFS Construction Type: Existing Construction Cause of Damage: Hurricane Ivan Managed Cost of Repairs: approximately $10 million Client: Insurance Company and owners Teamed with: Bennett Shuman, AIA and Tom Heifner, P.E. Primary Service Provided: Project management of the repairs Services Provided:
  • Forensic analysis
  • Moisture intrusion survey
  • Damage assessment
  • Water testing
  • IR analysis
  • Environmental testing and analysis testing and laboratory analysis
  • Managed blue print and bidders’ selection for construction in conjunction with architect
  • Expert witness and reporting
...